Bpost
The canal area in Brussels is famous for its industrial heritage, but today we are witnessing the integration of housing units within this urban fabric. On the former site of the BPost building, Stéphane Beel developed a master plan for a vierdeel. Towards the inside of the plot, the four buildings together form an intimate garden-room recognizable by the typology of an exuberant number of cantilevered terraces. Towards the outside of the plot, however, the approach is different: every building establishes a relationship with its neighbouring environment.
51N4E is responsible for the design of building B along Willebroekkaai. The building seeks to create a strong alliance with the park opposite and especially its potential to be recognized as a more open and attractive park, which is seen as a strong quality for the housing units. The east façade dissociates itself from the busy boulevard through panoramic loggias in a volume shifted back from the main road. The loggias are designed as a third (outdoor) room that creates a buffer zone with the street and a sheltered spot for the residents with a green view on the city park. Through their design and the possibility they offer of being closed off from the street with simple sliding glass panels, these loggias can also function perfectly as valuable winter gardens.
The one-bedroom apartments along the park side are developed as three-room apartments: a living area, a bedroom and a loggia. All three rooms are connected to each other and maximize the use of this small living unit into a generous apartment. The studios on the west side have a shorter depth and are mainly oriented along the length of the façade. All studios have three generous windows that let light enter deeply, but also establish a strong open relationship with the more silent inner courtyard.
-
Location
Brussels, Belgium
-
Client
AG Real Estate/ Vooruitzicht
-
Construction
2016 - 2019
-
51N4E project team
Johan Anrys, Freek Persyn, Aline Neirynck, Saar Tilleman, Olivier Cavens, Gerlinde Verhaeghe, Annaïk Deceuninck, Marta Petrov
-
51N4E involvement
Full Process
-
Structural engineer
Establis
-
Technical engineer
Istema
-
Acoustical engineer
Scala
-
Construction costs
€ 5.500.000
-
Programme
Studio’s (51 m² brut, 43m² netto), one-bedroom apartments (68 m² brut, 59m² netto) and office space
-
Built surface
8.400 m² (including terraces)
-
Photography
Filip Dujardin
-
Image credits
51N4E
Projects
- 50.000 Logements2010
- Alvéoles Saint-Nazaire2018
- Archiweek2021
- Arteconomy2009
- Atelier Deep Geothermia2015
- ASIAT2019
- Bpost2019
- Book Building2020
- Brussels 20402010
- BUDA Art Factory2012
- C-Mine2010
- C-Mine Atelier2023
- C-Mine Masterplan2023
- Citroën, the Soft Museum2017
- COD2015
- Corridor2022
- D'Ieteren2019
- De Lork2016
- Donysite2022
- Europetrol2006
- Falconpoort2016
- Ferme du Chaudron2018
- Fly Over2019
- Groeningemuseum2003
- Grootkapel2016
- Grote Markt2022
- Homborch2022
- Huis aan‘t Laar2012
- Huis van de Media2017
- IABR2016
- ICC2020
- Kaaitheater2017
- Kantoor +2008
- Lab North2018
- Lana Bridge2008
- La Théorie du balcon2004
- La Ville Hospitalière2020
- Lerend Landschap2018
- Labo XX2014
- Lage Weg2018
- Lamot2005
- Luxemburg in Transition2022
- Lyon Part Dieu2011
- Maritiem Park2016
- Masterplan Farmhouse2001
- Noka Blok2005
- Noord Zuid Limburg2020
- OCMW Nevele2012
- Over the Ring2019
- Ontharding Redingenhof2020
- Palaiseau2016
- Peterbos 92024
- Recypark2016
- Regatta2016
- Robin Oratoire
- Room in the City2016
- Skanderbeg Square2017
- Spartacus2024
- Speelpleinstraat2012
- StamEuropa2021
- Suitsupply2016
- Test Site Istanbul2011
- The Former Train Museum2024
- Thurgauerstrasse2014
- TID Tower2016
- Tous Ensemble2022
- Tri Postal2017
- Viaduct Gentbrugge2019
- Victoria2020
- WET 892005
- ZIN2020