ZIN
The innovative project ‘ZIN in No(o)rd’ aims to reuse the emblematic WTC I and II towers located in the heart of the Northern Quarter in Brussels. Instead of a simple restoration of the existing building, it is a question here of adding an unprecedented dimension to the project by connecting the towers with a new volume of 14 double-height floors, creating a new condition for the development of a hybrid building mixing a new way of working on housing, a hotel, sports and leisure spaces, shops and lots of vegetation. The relationship to the city is also completely redesigned with an open ground floor with many addresses, developing a range of relationships to the city and the public space. The project is thus a response to the surrounding context and future developments. This new flexible concept will introduce a new standard in Europe for large-scale mixed buildings.
The project insists radically on reuse, not only by considering the current building as a material bank but also thanks to an innovative architectural concept. By playing intelligently with the conditions and by complementing them with a number of strategic interventions and a prospective dimension, a robust building is designed. In the future, it can adapt flexibly to changing use. By adding a new volume with double-height floors, by providing various traffic circuits with many accesses, and by activating the urban space as if it were a shared hall, a mixed complex is set up which has not been thought for a type of use, but which may evolve over time.
In ‘ZIN in No(o)rd’, about 3,900 Flemish officials will find a new, inspiring and sustainable workplace focused on the idea of exchange and flexibility. The office spaces will offer the opportunity to meet and collaborate in a green and healthy work environment with varied surroundings. The apartments will be rented, and an innovative concept is planned for the hotel part, in collaboration with a specialized operator.
-
Location
Brussels, Belgium
-
Client
Befimmo NV
-
In collaboration with
l'AUC, Jaspers-Eyers
-
51N4E project team
Johan Anrys, Freek Persyn, Olivier Cavens, Louise Vanderlinden, Guillem Pons, Charlotte Schmidt, Janik Beckers, Hunter Doyle, Matthias Salaets, Laura Villeret, Alba Tavares Vanhoutte, Ruben Janssens, Gianni Villa
-
Consultants
Greisch (structure), VK Engineering (technical, EPB, durable energy, fire safety), De Fonseca (acoustics), VS-a (façade), Plant- en houtgoed (greenery), Drees & Sommer (circular building)
-
Programme
Mixed use - offices, apartments, hotel, retail, sport infrastructure, public (green) spaces
-
Site surface
10.800 m²
-
Built surface
115.000 m²
-
Photography by
Maxime Delvaux
Projects
Acte
- 50.000 Logements
- Alvéoles Saint-Nazaire
- Archiweek
- Atelier Deep Geothermia
- ASIAT
- Brussels 2040
- C-Mine Masterplan
- Corridor
- D'Ieteren
- Fly Over
- Lab North
- Lana Bridge
- La Ville Hospitalière
- Lerend Landschap
- Labo XX
- Lage Weg
- Luxemburg in Transition
- Maritiem Park
- Noord Zuid Limburg
- Over the Ring
- Ontharding Redingenhof
- StamEuropa
- Test Site Istanbul
- The Former Train Museum
- Thurgauerstrasse
- Viaduct Gentbrugge
Cast
- Alvéoles Saint-Nazaire
- Arteconomy
- Bpost
- Book Building
- BUDA Art Factory
- C-Mine
- C-Mine Atelier
- Citroën, the Soft Museum
- COD
- De Lork
- Donysite
- Europetrol
- Falconpoort
- Ferme du Chaudron
- Grootkapel
- Grote Markt
- Homborch
- Huis aan‘t Laar
- Huis van de Media
- IABR
- ICC
- Kaaitheater
- Kantoor +
- La Théorie du balcon
- Lamot
- Lyon Part Dieu
- Noka Blok
- OCMW Nevele
- Palaiseau
- Peterbos 9
- Recypark
- Regatta
- Robin Oratoire
- Room in the City
- Skanderbeg Square
- Spartacus
- Speelpleinstraat
- Suitsupply
- TID Tower
- Tous Ensemble
- Tri Postal
- Victoria
- WET 89
- ZIN